Five
Year Capital Plan
Parks
Highway
Public Buildings
Mechanic’s Garage
Recycling
Recreation Department
Water/Sewer Department
Waste Water Treatment Plant
Five
Year Capital Plan
2003-
2008
The City of Beacon has reconstructed and paved 14.87 miles of roads since 1993. There are approximately 50 miles of roads in the City of Beacon and to get our roads to reputable standard we have about 11 miles more of reconstruction to do. Attached is a list of roads I hope to finish this year or early next year. These estimates were based on length, width, drainage and sidewalks that will need to be completed. The estimates include engineering and inspection costs. The total cost of this program is $12,006,812. If it is funded over the next five years the cost is approximately $2,401,360 per year.
The City of Beacon receives approximately $250,000 a year from Community Development funds and $120,000 a year from CHIPS. This gives a total of $370,000.00 dollars a year without going into the General Fund. If this was the only money used it would take 32.5 years to complete these roads. If the plan was stretched over 10 years the cost would be $1,206,690 per year.
Six year Capital Plan 2003 - 2008
In 2002 the following roads should be completed: East Main Street, Overlook Avenue, Leonard Street, High Street and Verplanck Avenue. Liberty Street Bridge should go out to bid this year, and North Cedar Street and High Street were completed.
2004 Route 9D South
Main Street (Teller to Route 9D) - no sidewalks $ 400,000
Main Street (Teller to Schenck - south to dead end) $ 550,000
Schofield Place $ 230,000
Heaney Drive $ 475,000
Pearse Place $ 210,000
Phillips Street (Kristy to Wolcott) $ 405,000
Judson Street (Union to Route 9D) $ 100,000
Madison Street (Prospect to Judson) $ 100,000
Tillot (DePuyster to Washington) $ 100,000
Orchard Place (including Talbot) $ 260,000
Schenck Avenue $ 230,000
Dennings Avenue $ 100,000
Sycamore Drive $ 100,000
West Church Street $ 110,000
Total $ 3,370,000
Total (with engineering) $ 4,044,000
2005 North Chestnut Street $ 450,000
Howland Avenue (East Main to Wolcott) $ 500,000
North Walnut Street $ 390,000
Spring Street $ 104,000
Laurel Street $ 100,000
Teller Avenue (city share) $ 200,000
Fishkill Avenue (city share) $ 800,000
Total $ 2,544,000
Total (with engineering) $ 3,052,800
2006 North Brett Street $ 400,000
North Elm Street $ 450,000
Ralph Street $ 240,000
Rombout Avenue $ 900,000
South Avenue (Main to Wolcott) $ 400,000
South Avenue (Dennings to Wolcott) (city share) $ 240,000
Total $ 2,630,000
Total (with engineering) $ 3,156,000
2007 Spring Valley Street $ 350,000
Franklin Street $ 180,000
Caroline Street $ 180,000
Larch Street $ 60,000
Herbert Street $ 250,000
Kent Street $ 250,000
Wilkes Street (Deefield to North Walnut) $ 230,000
Miller Street $ 75,000 Total $ 1,585,000
Total (with engineering) $ 1,902,000
2008 Rende Drive $ 450,000
Oak Street (North Walnut to Cross) $ 290,000
Wolcott Avenue (Tioronda to South Avenue) $ 1,500,000 Total $ 2,240,000
Total (with engineering) $ 2,688,000
GRAND TOTAL (including engineering & inspection) $27,211,180
(water & sewer costs NOT included)
We began our capital plan in 1993 and following is a list of streets that have been done under the Roads Program since 1993 (including projects that will be completed this year).
Five-Year Capital Plan
Equipment
2003 - 2008
Highway Department
2003 ~ Replace 1988 backhoe $ 90,000
~ 10-wheeled dump truck to replace 8910 $ 123,000
2004 ~ Replace 1988 Elgin Sweeper $ 160,000
~ 1972 Front end loader with snow blower $ 190,000
Mechanic's Equipment
2003 Tire machine for 1-ton dump, cars, ets. $ 4,500
Scannor for big trucks $ 3,200
Park Equipment
2003 Replace white shed at Memorial Park $ 20,000
Resurface 3 basketball courts (South Avenue) $ 12,500
Resurface tennis courts (Green Street & South Avenue) $ 17,000
Transfer Station Equipment
2003 Front end loader & 260 skid steet $150,000
** We will try to get a matching grant for this equipment, the City’s cost would
then be reduced.
Five-Year Capital Plan
Public Buildings
2003 - 2008
Memorial Building:
- Heating system upgrade $ 75,000
- Fix retaining wall back $ 5,000
Municipal Center
- Upgrade air conditioning (police) $ 33,000
-
Redo concrete entrance (court & police) $ 10,000
Beacon Engine
- Replace all existing sash with new clad Low E
insulated tilt Pac by Marvin or equal.
Existing windows are drafty, inefficient
and many have broken seals making them
difficult to see through. $ 18,500
- Repaint all exterior surfaces of entire fire station
including bell tower, sash, soffits, trim,
fire escape, cornice and doors. $ 9,000
- Provide O.S.H.A. required source capture
exhaust systems in apparatus room. $ 8,500
- Provide infrared heat for apparatus room.
improved heating and efficiency $ 4,775
- Remove and replace 800 s.f. of V.C. tile and
underlayment on main floor. $ 3,200
- Provide additional lighting. $ 2,600
Headquarters
- Provide O.S.H.A. required source capture exhaust
system for apparatus room. $ 8,500
- Replace all existing sash with clad Low E insulated
tilt Pac by Marvin or equal. $ 29,000
- Provide and install weather-stripping including
new threshold and four exterior doors. $ 500
- Remove and replace 350 s.f. of V.C. tile and
underlayment with vinyl base. $ 1,500
Public Works Facilities
Highway/Mechanic Garage/Salt Shed/Gas Tanks $1.9
million
New building requested for 2004. Need urgently to address
existing safety issues with current facility.
Repairs to Highway Garage and Mechanic’s Garage
Need urgently to address existing safety issues with current facility. TOTAL - $305,000
Total
estimated cost for repairing these existing buildings - $325,000
Capital
Plan – 2002
2004
1 more volleyball court at Riverfront Park $ 1,000
1 sand box at Riverfront Park 200
8 tables and 5 grills at South Avenue 8,000
Replace lighting on tennis court at Memorial Park 20,000
Adjust lights on Ferrone Field and clean 3,000
Bleachers at South Avenue 2,000
2005
Pavilion or gazebo at Riverfront
Dock for fishing at Riverfront
2006
Renovate bathrooms at Green Street & upgrade $ 30,000
2007
Replace lights & poles on baseball fields – $ 20,000
Upgrade Green Street
2008
Lights on soccer field at Sargent
Upgrade Riverfront
Capital
Plan – 2002
Water
and Sewer Department
(Five
Year Plan)
Enclosed is the updated list of capital items that should be addressed with respect to the City’s Water Distribution and Sanitary Sewer Collection Systems.
With regard to the water distribution system, there are many older and/or undersized pipelines that deserve attention. Presently these lines consist of 4” and 6” diameter cast iron piping. These lines should be replaced with at least 8” diameter ductile iron pipe as per AWWA standards. Replacement of these lines and their appurtences would eliminate many repair and maintenance difficulties while ensuring greater flow volumes in these areas, thus, improving fire protection and allowing for future expansion and development.
Continuation of the presently on-going infiltration and inflow investigations and corrections program being conducted on the sanitary sewer collection system also remains a priority. This is the result of heavy flows through sanitary sewer pipelines during heavy rain and/or run-off events which cause overflowing of manholes as well as high influent level experienced at the Waste Water Treatment Facility.
This is a major cause for concern because much of this sewage discharges directly into the Fishkill Creek and the Hudson River. The Department of Environmental Conservation (DEC) as well as the Dutchess County Health Department continue to monitor this situation. The ensuing consequences for these discharges could result in heavy fines and/or a moratorium placed on any further property development.
The work involved with this project includes: smoke testing, dye testing, televising pipelines, metering flows and repairs and replacements of pipelines.
Water Main Improvements
1. South Avenue (Grandview Avenue to Tioronda Avenue) - 1,500 ft. $150,000
2. South Avenue (Tioronda Avenue to Dennings Avenue) – 4,000 ft. $275,000
3. Ferry Plaza - River Front Park Area – 1,000 ft. $ 50,000
4. Ralph Street (North Avenue to Cross Street) - 800 ft. $ 60,000
5. Fulton Avenue, Fowler Street, Vine Street Area - 1,600 ft. $100,000
Sanitary Sewer Improvements
Year I (2003)
North Interceptor sewer investigations $200,000
Various
interceptor replacements $500,000
$700,000
Year II (2004)
North Interceptor replacement $300,000
South Interceptor replacement $300,000
$600,000
Year III (2005)
Various Interceptor sewer replacements $300,000
Year IV (2006)
Various Sewer replacements/repairs $300,000
Year V (2007)
Various sewer replacements/repairs $300,000
Respectfully Submitted,
James McCollum
Capital
Plan – 2002
Waste
Water Treatment Plant
96
Dennings Avenue
Beacon,
New York 12508
(Five
Year Plan)
2004 2005 2006 2007
2008
Replace Grit Elevator $ 300,000
New windows – Administration Building 15,000
New floor covering – Administration Building 16,000
Security System – Entire Plant 40,000
New Door – rear of Administration Building 15,000
New Door – Chlorine Room 5,000
New Door – front of Administration Building 3,000
Rebuild one air blower 25,000
Rebuild one air blower 25,000
Rebuild one air blower 5,000
New motor & gear boxes – primary tanks 50,000
Convert #3 return pump to direct drive 12,000
Computer w/software for labs 3,500
Computer w/software – process control 3,500
Computer w/software – maintenance 3,500
New desks & chairs – Administration Building 10,000
Replace final scum pump & drive 15,000
Replace primary scum pump & drive 15,000
TOTAL $
447,000 $28,500 $25,000
$65,000 $15,000