The Planning Board meeting was held on
Chairman Hibbs asked for corrections/additions to the
minutes of the
ITEM NO. 1 PUBLIC HEARING ON
APPLICATION FOR SPECIAL USE
PERMIT, RESIDENTIAL/RETAIL, SUBMITTED BY
Mr. Hibbs read the public hearing notice printed in the Poughkeepsie Journal on
September 7, 2005 and opened the public hearing on the
application for a Special Use Permit, retail residential use, 544 Main Street,
LLC, located at 542-544 Main Street, identified on City Tax Maps as Section
6055, Block 81, Lot 575041.
Ayreh Siegal, representing owner Stacy Shurgin,
presented her proposal to renovate the building at
Mr. Stolman had no comments and Mr. Tully reported his comments can be fulfilled after the Special Use Permit application is referred to the City Council.
Dennis
Pavelock,
Michael
Benzer, owner of properties on
There were no further comments and Ms. Attaway made a motion to close the public hearing, seconded by Mr. Sheers. All voted in favor. Motion carried.
Mr. Gunn made a motion to recommend the City Council grant a Special Use Permit for the project subject to the applicant returning to the Planning Board for final site plan approval, seconded by Mr. Sheers. All voted in favor. Motion carried.
ITEM NO. 2 PUBLIC HEARING ON
APPLICATION PUBLIC HEARING
RELATIVE TO THE DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS)
FOR LONG DOCK BEACON, AS SUBMITTED BY THE SCENIC
TRUST, INC. AND FOSS GROUP BEACON, LLC
Mr. Hibbs read the public hearing notice and opened the public hearing relative to the Draft Environmental Impact Statement (DEIS) for Long Dock Beacon, property located on Red Flynn Drive, identified on City of Beacon tax maps as Section 5954, Block 32, Lot 488825; Section 5954, Block 32, Lot 481822; and Section 5954, Block 41, Lot 537725; and Town of Fishkill tax maps as Section 5954, Block 00, Lot 424816 and Section 5954, Block 00, Lot 472672.
Steve Rosenberg, Executive Director of Scenic Hudson Land
Trust, introduced the project team involved with the development of waterfront
property known as “Long Dock Beacon”.
Margorie Groten, Scenic Hudson Project Manager, and Ned Foss, Matt
Rudikoff and Larry Linder of the Foss Group Beacon, LLC were in attendance. Mr. Rosenberg explained Scenic Hudson was
originally involved in the project to help reconnect the people in Beacon with
the
Larry Linder reviewed the pamphlet handed out to members of the public which provided an executive summary of the Draft Environmental Impact Statement and an illustration of the proposed site layout. The hotel and commercial area is located in a long building positioned on the north side of the site to condense commercial activity and combine it with harbor activity. This was done to maximize the amount of land remaining for the park area. Activities on the site are all publicly accessible. The existing red barn slated for a boat building program is accessed over city property however the plan will evolve as the project progresses. The commercial area includes a 140 room hotel, two restaurants, a small spa and seasonal take-out food facilities. Mr. Linder explained their goal is to make the most environmentally sensitive green hotel in the country. The building is oriented for the best solar intake and to obtain the best river view while minimizing the visual impact of the development. Other environmental aspects include a geothermal system, a green vegetative roof and use of recyclable materials. The hotel will be committed to operating in a green healthy manner.
Ms. Groten explained there will be two pedestrian entrances – one to the south side onto a public porch and one along the main drive on the boardwalk leading to the civic plaza. The site will be served with picnic areas, a red barn boat building project, a man-made canal, a handicap accessible fishing pier, boating area, pedestrian trails, a lawn area and areas of tall meadow grass. The wetlands that are in poor condition will be restored. The trail will connect to the new Beacon Riverside Trail and eventually to Madam Brett Park. Overall there will be many areas for the public to enjoy, with a take out food area and public bathrooms.
Mr. Rudikoff explained that after the public comment session, the City and its consultants will combine public input with their own comments. This information will be provided to the applicant who will provide responses in the Final Environmental Impact Statement. The process with then move forward to the City Council for Special Use Permit review and to the Planning Board for site plan and subdivision review.
Mr. Stolman reported there is a 45-day time frame for the applicant to create the Final Environmental Impact Statement however the SEQR process allows that time frame to be exceeded if necessary. The Planning Board as Lead Agency must be sure the applicant’s responses to all comments are complete. Once the public hearing is closed, a 14-day period to allow submission of written comments which ends on September 27th.
Carmine
Serino,
Dennis Pavelock,
Ann
Cypher,
Kate
Dayton,
Mayor Clara Lou Gould,
Ann Meagher, President of the Greater Southern Dutchess Chamber of Commerce, also commended Scenic Hudson on behalf of the community. She supported the project on behalf of the 1,000 members of the Chamber and looked forward to see the project come to fruition.
Steven
Evans,
Flora Jones,
Jennifer Mackiewicz,
Tim Joseph, Chief of the City’s Fire Department, said
the Beacon Fire Department has no way of protecting the waterfront in the
manner it is presented. He had a long
conversation with Mr. Rudikoff who provided a written response to his concerns. Mr. Rudikoff’s correspondence indicated the
applicant doesn’t feel it is their responsibility to supply a fire boat and/or
a boat house. They believe it is the
City of
Mr. Gunn commended the applicant for taking on a Leed-Gold (Leadership in Environmental Education and Design) status for the project.
Dennis
Pavelock,
There were no further comments and Ms. Attaway made a
motion to close the public hearing, seconded by Mr. Sheers. All voted in favor. Motion carried. The comment period will remain open until
ITEM NO. 3 PUBLIC HEARING ON
APPLICATION FOR A SPECIAL USE
PERMIT, 64 SENIOR HOUSING UNITS, SUBMITTED BY BEACON
COMMUNITY FOUNDATION (ST. FRANCIS PROPERTY), CONKLIN
STREET
Mr. Hibbs
read the public hearing notice and opened the public hearing relative to an
application for a Special Use Permit, for a senior housing facility, submitted
by Beacon Community Foundation, property located off
Attorney Dan Leary, of Cuddy & Feder,
representing the Beacon Community Foundation, presented their proposal for a
senior housing facility on an 8.5 acre parcel adjoining
Mr. Karis
explained the 8.5 acre parcel has legal frontage on
Mr. McCormack described the architecture of the buildings that will be three stories in the front and two stories in the rear, consisting of brick and clapboard siding, balconies, sloped roof, gable and hip with a cupola in the center. Mr. McCormack explained that for the most part the architecture evokes a residential look so senior occupants have a feeling of home, a neighborhood and the community of Beacon.
Mike Coulter,
Anne
Cypher,
Mike Laneri,
Dennis Pavelock,
Mr.
Stolman explained the City Council has the approving authority and issues SEQRA
determinations with regard to Special Use Permit applications. Once they have acted, the application will
then return to the Planning Board for final site plan approval. He suggested that prior to the City Council
issuing a Special Use Permit a traffic study of
Mr. Tully provided a copy of his written comments to the applicant that included remarks about the wetlands and other comments of public concern. Board members expressed concern about traffic and emergency access and requested a traffic survey.
Anne Cypher,
Attorney Dan Leary explained they have agreed that residents will be exclusively 55 and older. Although federal law is more relaxed they have made that concession.
There were no further comments and Ms. Attaway made a motion to close the public hearing, seconded by Mr. Sheers. All voted in favor. Motion carried.
After some discussion, Ms. Attaway made a motion to recommend the City Council grant a Special Use Permit subject to submission and review of a traffic study of Delavan Avenue and Fishkill Avenue to determine if a traffic control device is warranted; revisiting the parking area and return to the Planning Board for final site plan review. The motion was seconded by Mr. Sheers. All voted in favor. Motion carried.
Mr. Stolman asked the applicant to provide an area on the plan where additional parking can be created in the future if needed.
ITEM NO. 4 PUBLIC HEARING ON
APPLICATION FOR SITE PLAN
APPROVAL, COFFEE HOUSE, SUBMITTED BY EB BEACON, LLC, 453
Mr. Hibbs
read the public hearing notice and opened the public hearing for a coffee
house, submitted by EB Beacon, LLC, property located at
Aryeh Siegel, representing EB Beacon, LLC, described
their proposal to relocate the Cthonic Clash coffee house to
Dennis Pavelock,
Walter
Castle,
Mr. Stolman and Mr. Tully had no outstanding comments on the Site Plan submission. There were no further comments and Mr. Gunn made a motion to close the public hearing, seconded by Ms. Attaway.
Mr.
Sheers made a motion to issue a negative SEQRA declaration, grant Site Plan
Approval and issue a Certificate of Appropriateness for the building at
ITEM NO. 5 PUBLIC HEARING ON
APPLICATION FOR SPECIAL USE
PERMIT, BED & BREAKFAST FACILITY, SUBMITTED BY BARBARA
WALLING,
Mr. Hibbs read the public hearing notice and opened
the public hearing relative to an application for a Special Use Permit, to
create a Bed & Breakfast facility, submitted by Barbara Walling,
Block 46,
Jeff Wilkinson, representing Barbara Walling,
described the proposal to convert the existing single family house at
Mr. Stolman asked that lighting details, including wattage, and signage details be added to the drawing. Mr. Tully noted the wood frame garage located on the property is referenced as “Phase 2” of the project. He advised that the note and every reference to it in application documents be removed if it is not part of this application. Mr. Wilkinson explained that they may convert it into an accessory use sometime in the future but that there are no specific plans at this time. He will take any and all references to “Phase 2” from the application form and Site Plan. Mr. Tully advised him to consider its future use in that design could be done now to accommodate site development in the future, i.e. parking, utilities, etc.
Kelly Johnson,
Anne
Cypher,
Dennis Pavelock,
Wendy Brown,
There were no further comments and Ms. Attaway made a motion to close the public hearing, seconded by Mr. Gunn. All voted in favor. Motion carried.
Mr. Gunn made a motion to recommend the City Council grant the Special Use Permit as requested, subject to removal of any and all references to Phase 2, and that they return for final site plan approval. The motion was seconded by Ms. Attaway. All voted in favor. Motion carried.
ITEM NO. 6 PUBLIC HEARING ON
APPLICATION FOR SPECIAL USE
PERMIT (AMENDMENT), ARTIST LIVE/WORK SPACE, SUBMITTED BY
TALLIX COMMERCIAL CONDOMINIUM, LLC,
Mr. Hibbs read the public hearing notice and opened the public hearing, relative to an application for a Special Use Permit, to renovate an existing building to create Artist Live/Work spaces on the Tallix site, submitted by Tallix Condominium, LLC, property located at 310 Fishkill Avenue, identified on City tax maps as Section 6054, Block 22,
Planning consultant Matthew Rudikoff described his client’s proposal to create seven artist live/work spaces in Buildings #2 and #3 on the Tallix site; and to convert a portion of a storage building into café space. Off-street parking requirements, calculations and spaces were clarified as requested. Areas for additional parking spaces were indicated on the plan if needed beyond the existing 141 spaces. Mr. Rudikoff explained the applicant believes parking is adequate based upon the ability to share spaces with day and night uses on site. The plan reflects that each unit will have individual heating systems and signage indicating the artists’ name.
Mr. Stolman reported the plan indicates Site Plan Approval where a Special Use Permit is required. The plan lists a total of 175 off-street parking spaces are required, 141 spaces provided and 34 potential spaces for future use if needed, however only 18 potential spaces are actually shown. After much discussion, Mr. Stolman explained the plan must demonstrate that a total of 175 parking spaces can be created.
Mr. Tully asked that the Site Plan clearly differentiate where concrete curbing and cobblestone edging will be used on site. Secondly, the area west of Building #1 shows an area of asphalt paving and concrete cobblestones but the intended use is not clear. If it is to be used as a pedestrian entryway it should be labeled as such.
Michael
Huxta,
The Max Protetch site plan called for a gate or barrier however it was unclear what exactly was required. Discussion took place regarding whether the property was City owned, or precisely where the property line ended. Tallix owner Lee Balter said before Max Protetch purchased the property, they kept the gate closed to prevent through traffic.
George
Mansfield,
Sara
Pasti,
Much
discussion took place regarding the barrier off
Mr. Sheers made a motion to recommend the City Council grant a Special Use Permit for the project subject to resolving the issues regarding through traffic and the applicant returning to the Planning Board for final site plan approval, seconded by Mr. Gunn. All voted in favor. Motion carried.
ITEM NO. 7 CONTINUE REVIEW ON
APPLICATION FOR SPECIAL USE
PERMIT, ACCESSORY APARTMENT,
JOHN GUNN
Due to a lack of Planning Board members in attendance, Mr. Gunn’s application could not be heard. Mr. Gunn explained this is the second time his application has been postponed for lack of attending members and every delay costs him more money. He feels somewhat punished for being an alternate member of the Planning Board. City Attorney Pisanelli reviewed information regarding property ownership that was questioned at a previous meeting. Based on his review, it is clear that Mr. Gunn owns the property in question based on the right-of-way information referenced in the 1884 deed. Mr. Tully and Mr. Stolman explained their comments have been addressed. Discussion took place regarding a solution to expand the number of Planning Board members or to increase attendance of those appointed.
ITEM NO. 8
CONTINUE REVIEW FOR FINAL SITE PLAN APPROVAL FOR
SPECIAL USE PERMIT, DAY CARE FACILITY,
SUBMITTED BY PROPERTY
OWNER MARK DEFABIO,
DAY SCHOOL
Engineer Charlie Brown reported his client’s application was referred to the City Council and a Special Use Permit for a day school was granted, subject to returning to the Planning Board for final site plan approval. Technical comments received from Mr. Tully’s office are being finalized and the easement agreement was executed as required.
Mr. Stolman explained a lighting fixture is noted to be mounted on an 8 ft. pole however the pole actually shown is 12 ft. The type of bulb to be used must be listed and some type of shield provided so light doesn’t splay off the site. Mr. Brown reported the lighting will be mounted on 8 ft. poles and will be shielded from adjacent property as required. Proposed signage details, in terms of location and size, must be added to the plan. Mr. Stolman said the floor plan still reflects two classrooms listed as #5 and should be appropriately numbered. Mr. Dexter made note that a Certificate of Appropriateness is required since the property is located in the historical overlay district.
Mr. Gunn made a motion to issue a Certificate of Appropriateness based on the presented elevations and grant final site plan approval subject to consultant comments listed above, seconded by Ms. Attaway. All voted in favor. Motion carried.
ITEM NO. 9 CONTINUE REVIEW ON
APPLICATION FOR SUBDIVISION,
TWO RESIDENTIAL LOTS, SUBMITTED BY
STREET
Eugene Ninnie of Civil Technologies representing Arnold Restivo, explained the last remaining issue with regard to this two lot subdivision is achieving appropriate sight distance. As recommended by Mr. Stolman, the applicant went to the Traffic Safety Committee to see if they would recommend limiting on-street parking near the driveway in order to improve the sight distance. The Traffic Safety Committee reviewed the request and did not recommend restricting parking because it may set a precedent for similar streets throughout Beacon. Mr. Stolman explained the City’s subdivision regulations address driveway intersections and require the same sight distance as a roadway intersection. He provided a copy of New York State Department of Transportation Policy and Standards for the Design of Entrances to State Highways, and ASHTO’s (American Association of State Highway and Transportation Officials) policy on Geometric Design of Highways and Streets for review. The requirements were reviewed, and speed limits and site restrictions were discussed at length. In order to resolve the issue, Mr. Stolman advised the applicant’s engineer to meet on site with a traffic engineer from his office in order to come to a final conclusion. Mr. Ninnie asked if they could demonstrate pre-existing conditions on the street warrant a speed reduction for safety. Discussion also took place regarding other lots on the street have the same sight distances. Mr. Dexter explained his understanding that all streets in the City are 30 m.p.h. unless otherwise posted, i.e. in school zones. City Attorney Pisanelli said Home Rule legislation from the state is required in order to reduce the City speed limit. On other points, Mr. Stolman suggested the easement at the end of the common driveway be increased, the turning template onto the street be removed, and the plan show that the fence has been removed.
REVIEW APPLICATION FOR SITE PLAN APPROVAL, BAR/RESIDENTIAL
USE (CHANGE OF USE FROM PRIVATE CLUB), SUBMITTED BY BEACON
TERMINAL ASSOCIATES,
Aryeh Siegel described the proposed change of use
from a private club to residential/bar establishment for the building located
at
Mr. Stolman asked that more detail with respect to parking calculations be provided. Additionally, too often site plans do not include proposed signage and in order to save time and money, a generic type sign should be provided so tenants need not return to the Planning Board for approval. Generic details including letter style, size and location could be provided.
No parking is shown to the rear of the building and
although no additional off-street parking is required, some definition as to
what will be taking place there should be provided. Mr. Tully expressed concern that the rear
space is utilized now yet the plan does not show any activity.
Mr. Dexter questioned the 1964 use listed on the plan. He recalled the building was used for public assembly on the second floor and retail on the first floor. The building’s last use was an illegal social club. He asked Mr. Siegel to meet with him to clarify the building’s use in order to appropriately determine the parking schedule. Lastly, this application should be a Special Use Permit due to the addition of a residential component.
There were no further comments and Mr. Gunn made a motion to set a public hearing for the month of October, seconded by Ms. Attaway. All voted in favor. Motion carried.
ITEM NO. 11 REVIEW APPLICATION
FOR SPECIAL USE PERMIT, ARTIST
LIVE/WORK SPACE, SUBMITTED BY PETER O’KENNEDY, 3 WATER
STREET
Aryeh Siegel described his client’s proposal to
create artist live/work space in an existing garage located at
Mr. Stolman asked that dimensions of the various spaces be provided on the plan as
they relate to Section 223.24.3(A)(5). The type of proposed artist work and color of corrugated siding on the building must be provided. There were no further comments and Mr. Sheers made a motion to set a public hearing for the month of October, seconded by Ms. Attaway. All voted in favor. Motion carried.
ITEM NO. 12 REVIEW APPLICATION
FOR SUBDIVISION, 2 RESIDENTIAL
LOTS, SUBMITTED BY PAGGI, MARTIN & DELBENE, LLP, 97 VERPLANCK
AVENUE
Ernst Martin, of Paggi, Martin & DelBene, presented
the plan for a two lot subdivision of property located at the corner of
Mr. Tully
provided Mr. Ernst with a copy of his engineering comments for review. He asked that a construction phasing plan be
provided to assure the project will be properly coordinated. Mr. Tully recommended that the drain line for
Lot #1, proposed to run behind the sidewalk and tied directly into the catch
basin on
After further discussion, Mr. Sheers made a motion to set a public hearing for the month of October, seconded by Ms. Attaway. All voted in favor. Motion carried.
Miscellaneous Business:
1. Architectural Review: Single Family House,
Members reviewed an elevation drawing of a new single
family house on
2. Architectural Review: Single Family House,
Members reviewed an elevation drawing of a new single family house on Prospect
Street. After reviewing and debating the proposed design, members agreed that the house appeared to be too dissimilar to homes on either side of the subject parcel.
3.
Ron Piccone submitted a proposal to enclose the
former bank drive-in window located in the
There was no further business to discuss and Ms. Attaway made a motion to
adjourn the meeting at